俄罗斯斯维尔德罗夫斯克压路机运输项目

类别:我们的业绩 发布日期:2012/3/23 浏览次数:1557

该批设备的发运遇到前所未有的困难。第一,工厂专用线货物积压严重;第二,该批设备的发运时间恰逢汶川大地震,全路平板车只用于抗震救灾设备的运输;第三,赶上军用保密物资运输。

在这种情况下,经过永信达上下协调,于5月底从上海局外调来足够数量的空车将设备全部发出。

虽然在运输过程中永信达付出了高昂的代价,但是在解决问题过程中,永信达与哈萨克斯坦方铁路总局和俄罗斯铁路局的高层进行了深入的沟通,结下了深厚的友谊,并给我们指出了解决问题的最佳途径和方向,这为永信达下一步大型设备的运输打下了坚实的基础。

We faced difficulties we never faced before. First, special line was occupied by serious backlog of goods. Second, time of this equipment transportation coincides with the Wenchuan earthquake, the whole railway flatbed truck used only for earthquake relief equipment transport. Third, it catch up with the transportation of confidential materials for military.

In this case, through the coordination of Yongxinda, Yongxinda finally from the Shanghai station of sufficient wagons and dispatched roller at the end of May.

Yongxinda paid more for this transportation, but in problems solving, Yongxinda have communicated with the high class of Kazakhstan Railways and Russian Railways Irkutsk Bureau and developed a deep friendship. We found the best way and direction of solving problems. This became a solid base of Yongxinda in future transportation of large equipment.