当前位置>>

哈萨克斯坦曼格什拉克柴油发电机组运输项目

类别:我们的业绩 发布日期:2012/3/23 浏览次数:1513

2009年1月永信达办理了一批柴油发电机组设备自南京至哈萨克斯坦曼格什拉克的国际铁路联运业务。
在货物发运前要求客户提供发货资料(单件货物的三视图、照片及详细装车清单、照片),以便制作国外换装加固方案。要求国外代理在制作方案时做到合理换装。
永信达认真核对客户提供的报关单据,安排报转关业务,提供货物的全程信息跟踪服务。在永信达公司的精心安排下,车皮提前到位,从而保证了货到后采取直接对装的装车方式,为客户节省了装车发运时间,同时对货物的安全也提供了更大的保障,大大满足了客户抢时间、抢进度、保安全的到货需求。
In January 2009, Yongxinda handled international railway transport of large sets of diesel generator equipment from Nanjing to Kazakhstan mangyshlak .
According to the information of cargos from clients and factories, such as cargos' photo, 3D-view drawings, loading photos, and detailed loading lists, our company immediately made transfer loading schemes, and request abroad agent make reasonable transfer loading.
Yongxinda seriously reviewed customer documents for Customs, arranged Customs clearance and Customs transmit, provided tracing information. Due to the meticulous arrangement of Yongxinda, empty wagons were put in place for loading ahead of schedule, which ensured the cargos can be directly loaded into wagons. Time of loading cargos was saved, meanwhile, safety was ensured. The requirements of client  fast, reliability and safety, were well satisfied.